Finally got time to work on the trailer this week and was able to insulate and seal up the bottom with tarp material. This is the same technique that many of the manufacturers use. After sealing up the bottom I was able to bolt the deck to the frame using a dozen 3/8" carriage bolts. Since the deck was mostly salvaged material I had a few last minute holes to patch before rolling out the new vinyl flooring. The pictures you see are the bottom side of the deck as I was insulating and then later after the deck was bolted on.
The large square hole in the deck is where the black water tank is going to be placed.
After rolling out the new vinyl flooring I covered it with clear plastic just to protect it while the rest of the construction is going on.
The large square hole in the deck is where the black water tank is going to be placed.
After rolling out the new vinyl flooring I covered it with clear plastic just to protect it while the rest of the construction is going on.
No comments:
Post a Comment